Explore our refining, storage, logistics, and technology components redefining energy infrastructure in the Suez Corridor
ARTEEK's strategic initiative to transform regional energy ecosystems
ARTEEK is building a next-generation industrial and energy complex on the southern edge of Ras Ghareb, along the Suez Gulf, one of the world's most strategic corridors for global trade and energy flow.
ARTEEK's mission is not just to build infrastructure — but to rethink how energy, logistics, and industrial development are integrated in one ecosystem:
From conventional refining to high-efficiency, digitalized plants with AI integration
Linking petroleum, petrochemicals, and logistics into a single export-ready system
Incorporating renewables, desalination, and waste management into core operations
Flexible investment options and collaboration with global EPCs and tech leaders
Four integrated divisions forming a complete energy and industrial ecosystem
Our flagship processing facility designed for efficiency and environmental performance
Capacity | 200,000 barrels per day |
---|---|
Primary Outputs | Diesel, gasoline, jet fuel, naphtha, LPG |
Technology | Modular refining units, AI-integrated operations, low-sulfur emissions systems |
Efficiency | 94% utilization rate target with advanced process control |
AI-powered predictive maintenance and optimization systems
Meets EURO V standards with advanced sulfur recovery units
Capability to process multiple crude grades efficiently
Maximizing value from crude through advanced chemical processing
1.2 million tons annual capacity
PE & PP production for domestic and export markets
Specialty chemicals for high-value applications
Comprehensive infrastructure for seamless product movement and value-added services
4 tanks × 250,000 tons = 1,000,000 tons total (~7.3M barrels)
800m jetty accommodating 3 vessels simultaneously
Designated area for industrial investors with tax incentives
Essential services enabling smooth operations and community development
500 MW combined-cycle generation (scalable to 750 MW)
250,000 m³/day capacity using reverse osmosis
120-bed medical center serving employees and community
ARTEEK's integrated model delivers unmatched operational synergies
Refining and petrochemical plants within walking distance for maximum efficiency
Common power, water and steam systems across all divisions
Products move from production to vessels within minutes
Pre-approved land parcels with infrastructure and governance framework
ARTEEK offers an equity-based investment model with $10,000 shares and a minimum subscription of 500 shares. Investors are guaranteed full return of capital after two years if they decide not to continue.
Download Investment Deck